Grizzly Paw Brewery and Production Facility

Grizzly Paw Brewery and Production Facility

GRIZZLY PAW BREWERY AND PRODUCTION FACILITY Contemporary and traditional architecture collide to create this unique industrial building in Canmore. Client: Grizzly Paw Brewing Company Location: Canmore, AB Project Type: Buildings About This Project...
Elevation Place

Elevation Place

Project Description   Located in Canmore, Elevation Place is a 66,325 m2 multi-use facility that is the heart beat of the community. Opened in 2013, Canmore’s indoor playground features a competition-size swimming pool, a water slide and lazy river, a climbing...
Banff Fenlands Recreation Centre

Banff Fenlands Recreation Centre

Project Description:   Originally built in 1958, the Banff Fenlands Recreation Centre was in need of redevelopment to provide a beautiful and lasting structure for the community and visitors. Working with the Town of Banff the project team was able to deliver on...
Bowness Park Redevelopment

Bowness Park Redevelopment

BOWNESS PARK REDEVELOPMENT Bowness Park is a 30 hectare (74 acres) urban park on the Bow River. It is popular for picnics, boating, and ice skating on the lagoon and the canal which feeds it. Client: City of Calgary Location: Calgary, Alberta Project...
Waterton Lakes Visitor Centre

Waterton Lakes Visitor Centre

WATERTON LAKES VISITOR CENTRE The new Waterton Lakes National Park Visitor Centre will support the over 400,000 visitors the park with a design that connects the Centre’s indoor and outdoor spaces. Client: Parks Canada Agency Location: Waterton National...
Great Chief Park Enhancement Plan

Great Chief Park Enhancement Plan

GREAT CHIEF PARK ENHANCEMENT PLAN The City of Red Deer retained ISL to prepare an Enhancement Plan to guide the long term upgrading of Great Chief Park, the premier sports park in central Alberta. Client: City of Red Deer Recreation, Parks and Culture Location: Red...
Banff Elementary School Phase 2

Banff Elementary School Phase 2

Project Description   The project involved construction of Phase 2 Banff Elementary Replacement School after ISL completed Phase 1 in 2016. The new 2-phase, 2-storey building with an aggregate of 3,542-m2 replacement school combined the use of structural steel,...