17 Avenue SE Stampede Crossing LRT

17 Avenue SE Stampede Crossing LRT

Project Description In 2019, ISL – with partner WSP and GEC – was retained by CMLC to undertake construction feasibility, cost-benefit review, detailed design, and construction of the new 17 Avenue SE Stampede Crossing (17SX). This station reconstruction includes...
Highway 3:02 Functional Planning Study

Highway 3:02 Functional Planning Study

HIGHWAY 3:02 FUNCTIONAL PLANNING STUDY Highway 3, from east of Sentinel to North of Pincher Creek, is currently being considered for twinning for a total length of approximately 54 km. Client: Alberta Transportation Location: Crowsnest Pass, AB Project...
Deltaport Truck Staging Facility

Deltaport Truck Staging Facility

Project Profile   As part of the Deltaport Terminal Road and Rail Improvement Program (DTRRIP), Vancouver Fraser Port Authority (VFPA) proposed a truck staging facility as part of a series of ancillary road initiatives aimed at mitigating the impacts of the...
Greenwood Flood Protection

Greenwood Flood Protection

Project Profile   ISL partnered with the City of Greenwood and prepared a grant application through the Community Emergency Preparedness Fund in 2019. The application was successful and the City was awarded $150,000 to fund a flood mapping, flood planning and...
Elkford Flood Protection

Elkford Flood Protection

Project Profile   The District of Elkford required detailed floodplain mapping to investigate the combined hazards from flooding and geomorphic hazards. In 2018, ISL was retained to undertake a floodplain assessment, flood mapping and flood mitigation options for...
Beaver Boardwalk

Beaver Boardwalk

Project Profile   Beaver Boardwalk, with its 3.0km length, is the world’s longest freshwater boardwalk. It showcases the local wetland system around Maxwell Lake, Hinton. The boardwalk meanders through marshland and fens, bringing visitors close to the active...
Poplar Sanitary Lift Station and Forcemain

Poplar Sanitary Lift Station and Forcemain

Project Profile   The Village of Pemberton’s sanitary sewer catchment encompasses an area of 89 hectares comprised largely of residential land use. When it became clear that major portions of the existing sanitary sewer collection system were not only inadequate...
Sanitary Trunk Main at Nita Lake Lodge

Sanitary Trunk Main at Nita Lake Lodge

Project Profile   A significant portion of the existing sanitary trunk main for the Resort Municipality of Whistler aligns parallel and immediately adjacent to the existing CN Rail tracks. Through evaluation of CCTV works, a joint separation of 150mm was...