Highway 532 and Highway 940 Flood Repair Work

Highway 532 and Highway 940 Flood Repair Work

HIGHWAY 532 AND HIGHWAY 940 FLOOD REPAIR WORK During the extreme flooding of Southern Alberta in 2013, Provincial Highway 532:02 and Forestry Trunk Road South were dramatically impacted. Client: Alberta Transportation and Utilities Location: Longview, AB...
Erin Ridge North Stage 1-7

Erin Ridge North Stage 1-7

ERIN RIDGE NORTH STAGE 1-7 ISL was engaged to facilitate development of 83ha of residential, commercial and institutional land and wetponds in northeast St. Albert. Client: Landrex Hunter Ridge Inc. Location: St. Albert, Alberta Project Type: Community Development...
G37 Interchange

G37 Interchange

G37 INTERCHANGE ISL and CH2M Hill partnered as lead consultants to the City of Calgary for functional planning, design and construction of a grade separated interchange at Glenmore Trail and 37 Street SW. Client: City of Calgary Location: Calgary, Alberta Project...
Eroded Riverbank Stabilization – Calgary

Eroded Riverbank Stabilization – Calgary

ISL was engaged by The City of Calgary to conduct the design and construction of stabilization and rehabilitation measures for multiple sites that were severely eroded by the June 2013 flood event. ISL managed five riverbank stabilization programs at the following...