Greenwood Flood Protection

Greenwood Flood Protection

GREENWOOD FLOOD PROTECTION ISL partnered with the City of Greenwood to help prepare a a flood mapping, flood planning and flood risk assessment study. The study relied heavily on GIS mapping, hydrotechnical engineering and hydrology. Client: City of Greenwood...
Elkford Flood Protection

Elkford Flood Protection

ELKFORD FLOOD PROTECTION In 2018, ISL was retained to undertake a floodplain assessment, flood mapping and flood mitigation options for Elk River, Boivin Creek and Crossing Creek within the District boundary. Client: District of Elkford Location: Elkford, BC Project...
Waiparous Creek Bridge

Waiparous Creek Bridge

WAIPOROUS CREEK BRIDGE Alberta Environment and Parks (AEP) retained ISL to design a single lane, clearspan bridge and approaches to provide permanent crossing over Waiparous Creek. Client: Alberta Environment and Parks Location: Ghost Public Land Use Zone, Alberta...
Sheep Paddocks Trail

Sheep Paddocks Trail

SHEEP PADDOCKS TRAIL Trail development work included bank stabilization, invasive plant removal, riparian habitat restoration planting and a 1.5 ha constructed wetland. Client: Metro Vancouver Location: Coquitlam, BC Project Type: Landscape Architecture and Municipal...
Highway 3 Corridor Improvements – Saturday and Sunday Creek

Highway 3 Corridor Improvements – Saturday and Sunday Creek

HIGHWAY 3 CORRIDOR IMPROVEMENTS: SATURDAY AND SUNDAY CREEK ISL was retained to design improvements to the highway’s safety and mobility along a 5km stretch, including meeting a 100km/h design speed and improving passing opportunities. Client: BC Ministry of...
Highway 532 and Highway 940 Flood Repair Work

Highway 532 and Highway 940 Flood Repair Work

HIGHWAY 532 AND HIGHWAY 940 FLOOD REPAIR WORK During the extreme flooding of Southern Alberta in 2013, Provincial Highway 532:02 and Forestry Trunk Road South were dramatically impacted. Client: Alberta Transportation and Utilities Location: Longview, AB...
Eroded Riverbank Stabilization – Calgary

Eroded Riverbank Stabilization – Calgary

ERODED RIVERBANK STABILIZATION ISL was engaged by The City of Calgary to conduct the design and construction of stabilization and rehabilitation measures for multiple sites that were severely eroded by the June 2013 flood event. Client: City of Calgary Location:...
Cougar Creek Landscape and Channel Protection

Cougar Creek Landscape and Channel Protection

COUGAR CREEK LANDSCAPE AND CHANNEL PROTECTION After the devastating flood in June 2013 caused widespread damage to properties, highways and infrastructure along Cougar Creek, Canmore had to act quickly to provide an engineered solution. Client: Town of...