Project Description In 2019, ISL – with partner WSP and GEC – was retained by CMLC to undertake construction feasibility, cost-benefit review, detailed design, and construction of the new 17 Avenue SE Stampede Crossing (17SX). This station reconstruction includes...
Project Profile Between 1986 and 2016, the Calgary region experienced tremendous growth and became one of the leading economic regions of Canada. In this 30-year period, Calgary more than doubled its population, and other area municipalities, including Airdrie,...
Project Profile ISL partnered with the City of Greenwood and prepared a grant application through the Community Emergency Preparedness Fund in 2019. The application was successful and the City was awarded $150,000 to fund a flood mapping, flood planning and...
Project Profile The District of Elkford required detailed floodplain mapping to investigate the combined hazards from flooding and geomorphic hazards. In 2018, ISL was retained to undertake a floodplain assessment, flood mapping and flood mitigation options for...
Project Profile The Southern Alberta Fisheries Habitat Enhancement and Sustainability (FISHES) Program was developed to mitigate the risks to aquatic environments caused by extensive fording and off-roading following the 2013 floods. FISHES proposed the...
ISL was engaged by The City of Calgary to conduct the design and construction of stabilization and rehabilitation measures for multiple sites that were severely eroded by the June 2013 flood event. ISL managed five riverbank stabilization programs at the following...
Project Description The Calgary Zoo’s old swing bridge over the Bow River that connected Zoo attractions had long been condemned, and when the 2013 floods hit the City of Calgary it was in the way of flood mitigation efforts. The bridge, originally built in 1960s was...