17 Avenue SE Stampede Crossing LRT

17 Avenue SE Stampede Crossing LRT

Project Description In 2019, ISL – with partner WSP and GEC – was retained by CMLC to undertake construction feasibility, cost-benefit review, detailed design, and construction of the new 17 Avenue SE Stampede Crossing (17SX). This station reconstruction includes...
Variable Speed Limit Scoping Study on QEII

Variable Speed Limit Scoping Study on QEII

VARIABLE SPEED LIMIT SCOPING STUDY ON QEII  Alberta Transportation (AT) initiated this VSL scoping study to outline specific requirements for implementation on the QEII corridor between Calgary and Edmonton. Client: Alberta Transportation Location: Alberta Project...
Nanaimo Emergency Services Evacuation Route Planning

Nanaimo Emergency Services Evacuation Route Planning

NANAIMO EMERGENCY SERVICES EVACUATION ROUTE PLANNING The intent is to enhance Nanaimo’s  resiliency in responding to emergencies. Client: Regional District of Nanaimo Location: Nanaimo, BC Project Type: Transportation About This Project The Regional District of...
Highway 3:02 Functional Planning Study

Highway 3:02 Functional Planning Study

HIGHWAY 3:02 FUNCTIONAL PLANNING STUDY Highway 3, from east of Sentinel to North of Pincher Creek, is currently being considered for twinning for a total length of approximately 54 km. Client: Alberta Transportation Location: Crowsnest Pass, AB Project...
North Calgary Regional Transportation Study

North Calgary Regional Transportation Study

Project Profile   Between 1986 and 2016, the Calgary region experienced tremendous growth and became one of the leading economic regions of Canada. In this 30-year period, Calgary more than doubled its population, and other area municipalities, including Airdrie,...
Greenwood Flood Protection

Greenwood Flood Protection

Project Profile   ISL partnered with the City of Greenwood and prepared a grant application through the Community Emergency Preparedness Fund in 2019. The application was successful and the City was awarded $150,000 to fund a flood mapping, flood planning and...
Elkford Flood Protection

Elkford Flood Protection

Project Profile   The District of Elkford required detailed floodplain mapping to investigate the combined hazards from flooding and geomorphic hazards. In 2018, ISL was retained to undertake a floodplain assessment, flood mapping and flood mitigation options for...
Waiparous Creek Bridge

Waiparous Creek Bridge

Project Profile   The Southern Alberta Fisheries Habitat Enhancement and Sustainability (FISHES) Program was developed to mitigate the risks to aquatic environments caused by extensive fording and off-roading following the 2013 floods. FISHES proposed the...