HIGHWAY 3:02 FUNCTIONAL PLANNING STUDY Highway 3, from east of Sentinel to North of Pincher Creek, is currently being considered for twinning...
READ MOREGreenwood Flood Protection
GREENWOOD FLOOD PROTECTION ISL partnered with the City of Greenwood to help prepare a a flood mapping, flood planning and flood risk assessment...
READ MOREElkford Flood Protection
ELKFORD FLOOD PROTECTION In 2018, ISL was retained to undertake a floodplain assessment, flood mapping and flood mitigation options for Elk...
READ MORESheep Paddocks Trail
SHEEP PADDOCKS TRAIL Trail development work included bank stabilization, invasive plant removal, riparian habitat restoration planting and a...
READ MOREMinoru Lakes District Renewal
MINORU LAKES DISTRICT RENEWAL Centre to the park renewal is the creation of an ecologically healthy and resilient lake water system. Renewal...
READ MOREHighway 1 North Fork Bridge Replacement and Four Laning
HIGHWAY 1 NORTH FORK BRIDGE REPLACEMENT AND FOUR LANING The Trans-Canada Highway 1 is Canada’s national highway and is crucial for the movement...
READ MORERegina City-Wide Stormwater Model Development
REGINA CITY-WIDE STORMWATER MODEL DEVELOPMENT With new modelling standards, operating procedures and trained staff, the City can look forward...
READ MOREMarine Drive Beach Lift Stations
MARINE DRIVE BEACH LIFT STATIONS ISL designed an upgraded sanitary system that would eliminate two existing lift stations and replace three...
READ MORE