Greenwood Flood Protection

Greenwood Flood Protection

GREENWOOD FLOOD PROTECTION ISL partnered with the City of Greenwood to help prepare a a flood mapping, flood planning and flood risk assessment study. The study relied heavily on GIS mapping, hydrotechnical engineering and hydrology. Client: City of Greenwood...
Elkford Flood Protection

Elkford Flood Protection

ELKFORD FLOOD PROTECTION In 2018, ISL was retained to undertake a floodplain assessment, flood mapping and flood mitigation options for Elk River, Boivin Creek and Crossing Creek within the District boundary. Client: District of Elkford Location: Elkford, BC Project...
Eroded Riverbank Stabilization – Calgary

Eroded Riverbank Stabilization – Calgary

ERODED RIVERBANK STABILIZATION ISL was engaged by The City of Calgary to conduct the design and construction of stabilization and rehabilitation measures for multiple sites that were severely eroded by the June 2013 flood event. Client: City of Calgary Location:...