On Tuesday, November 26th ISL won a Award of Merit at the ACEC-SK Brian Eckel Awards
There was a clear safety issue with the barriers and handrails connections. ISL considered options with an in-house tool based on a probabilistic approach to intervention. After demolition a significant amount of the concrete had been discovered as damaged by freeze thaw deterioration. ISL addressed the deterioration within the construction budget.
ISL’s rehabilitation plan brought the infrastructure up to code, accommodated safety requirements; and recommended a long term maintenance strategy.
Your Next Read
ISL Expands in the Columbia Valley
ISL Expands in the Columbia ValleyISL’s longstanding work in the Columbia Valley now has a permanent home. After several years of successful project...
ISL Recognized with Three Premier’s Awards
ISL Recognized with Three Premier’s AwardsISL was honoured with three awards at the Premier’s Awards of Excellence in Design, presented during SK...
ISL Announces New Executive Leadership Team
ISL Announces New Executive Leadership TeamISL has evolved over the years — growing to more than 600 professionals across 15 offices throughout...



