Eastbourne Water Upgrades

Eastbourne Water Upgrades

Project Profile The Sunshine Coast Regional District (SCRD) operates the Eastbourne Water System on Keats Island, where the existing aquifer is reliant on precipitation. To improve the water supply to the system and to ensure a safe and sustainable drinking water...
Inlet Boardwalk Replacement

Inlet Boardwalk Replacement

Project Description   The Inlet Boardwalk Replacement project extends 440 m and forms part of the Shoreline Trail that runs 2.0 km along the south-east shore of the Burrard Inlet. The boardwalk, bridge and trail system cross rare and environmentally sensitive...
South Slocan Overhead

South Slocan Overhead

Project Description   ​ISL was retained by the BC Ministry of Transportation and Infrastructure (MoTI) for functional design, detailed design, and tender and construction services, to replace a highway overpass structure (South Slocan Bridge) on Highway 3A...
Sheep Paddocks Trail

Sheep Paddocks Trail

Project Profile   Sheep Paddocks Trail, located within Colony Farm Regional Park in Coquitlam, BC, provides a multi-use hiking and cycling link between the regional Traboulay PoCo Trail and the Mundy Creek Trail. ISL was engaged to provide design, tendering, and...
Town of Sylvan Lake Hydrogeological Study

Town of Sylvan Lake Hydrogeological Study

Project Profile The Town of Sylvan Lake provides drinking water to its residents by means of seven groundwater source wells. A numerical model of groundwater flow was constructed and calibrated to examine the aquifer sustainability and its capability of supplying...
Cliff Gilker Park Sports Field Groundwater Investigation

Cliff Gilker Park Sports Field Groundwater Investigation

Project Description The Sunshine Coast Regional District made the sustainably minded decision to investigate the use of groundwater for irrigation purposes at the Cliff Gilker Park sports field. The park was using potable water to provide irrigation, which caused...
Pitt Meadows Hydrogeological Assessment

Pitt Meadows Hydrogeological Assessment

Project Description The City of Pitt Meadows expressed an interest in studying the effect increasing development would have on shallow groundwater levels Stage 1, a desktop hydrogeological assessment, was completed in November 2020 and used existing geotechnical data...