ISL at TACCONF 2026 in Winnipeg

ISL is heading to Winnipeg for the 2026 TAC Conference and Exhibition, October 4 to 7 at the RBC Convention Centre. As Canada’s largest annual gathering of transportation professionals, TAC brings together the people shaping how this country moves, and we’re proud to be part of the conversation. Visit us at the conference to connect with our team, see the projects we’re bringing to the table, and talk through what’s next for transportation infrastructure across Western Canada.

ISL at TACCONF 2026 in Winnipeg

ISL is heading to Winnipeg for the 2026 TAC Conference and Exhibition, October 4 to 7 at the RBC Convention Centre. As Canada’s largest annual gathering of transportation professionals, TAC brings together the people shaping how this country moves, and we’re proud to be part of the conversation. Visit us at the conference to connect with our team, see the projects we’re bringing to the table, and talk through what’s next for transportation infrastructure across Western Canada.

October 4-7, 2026

Program Schedule

Matt Taylor

M.Eng., P.Eng., P.TOE

Manager, Transportation Planning

Monday     10/5/2026

GD.8: Urban Design Challenges – Accessibility, Vision Zero, and Complete Streets 

Breaking the School “Snake Effect” through Improved Pedestrian, Bicycle, and Vehicle Circulation

Time: 2:00 pm – 3:30 pm

 

  • Reversing and combining circulation streams to reduce self-intersecting movements

  • Reallocating frontage space to expand and consolidate pick-up and drop-off activity

  • Separating pedestrian and vehicle movements through geometric narrowing and clarified desire lines

  • Consolidating school bus operations to discourage informal pedestrian crossings

  • Introducing visible activity anchors, such as relocated bicycle parking, to create supervised waiting hubs

Cameron Matwie

MBA, M.Sc., P.Eng., ENV SP, VMA

Partner | Manager, Transportation Planning

Eddy Jarbeau

P.Eng., CAPM

Transportation Engineer

Monday     10/5/2026

TP.2: Complete Networks – Fitting into the Bigger Picture

Edmonton Region Network Study: Advancing Regional Transportation Through Integrated Corridor Evaluation

Time: 2:00 pm – 3:30 pm

 

  • Building future travel demand from municipal growth plans for a region of 3 million
  • Grouping more than 100 candidate projects into modelling packages to test network-wide benefits
  • Evaluating projects across 29 multiple account criteria that go beyond traffic performance
  • Comparing competing corridors across 12 sub-areas using modelling, evaluation, and stakeholder input
  • Applying a replicable, evidence-based framework to guide long-term regional investment

Sadegh Kazemi

Ph.D., P.Eng.

Manager, Bridge/Structural

Tuesday     10/6/2026

AM.10: Strategic Asset Management for a Strong and Resilient Canada

Bridge Infrastructure

Ariel McCance

P.Eng., RSP1

Transportation Engineer

Tuesday     10/6/2026

RS.3: Safe Road Design

Evaluating Safe Interchange Designs During Functional Planning

Time: 10:30 am – 12:00 pm

 

  • Evaluating safety for vehicles and vulnerable users when comparing interchange options during functional planning
  • Working around the limits of SPFs and CMFs when the crossroad does not yet exist
  • Estimating expected collision frequency with the FHWA planning tool
  • Comparing conflict points and high-speed conflicts across interchange types
  • Combining collision estimates with TEC’s benefit cost analysis tool to inform option selection

Borg Chan

M.Sc., P.Eng., PTOE, FITE, RSP1

Partner | Road Safety Specialist

Wednesday     10/7/2026

TP.14: Integrated Transit and Multimodal Corridor Planning – Advancing Transit Implementation in Canadian Cities

City of Burnaby Bus Speed and Reliability Program – Hot Spot Study

Time: 10:30 am – 12:00 pm

 

  • Combining delay data, field observations and operator feedback to identify bus delay hot spots 
  • Prioritizing improvements by balancing transit benefits, cost and impacts to other road users
  • Evaluating transit priority measures such as queue jumps, signal priority, and bus stop relocations
  • Delivering high benefit-cost results through queue jumps and dedicated turn pockets
  • Working through data gaps, narrow corridors and variable delay patterns in urban transit planning

Jiwanjot Bariyar

P.Eng.

Transportation Engineer

Alana Getty Somers

P.Eng.

Board Director | General Manager, Transportation

Wednesday     10/7/2026

GD.4: All Highways Great and Small – Interchanges, Major Facilities, and Two-Lane Highways 

Delivering Network Value and Safety on Calgary’s 144 Avenue NW

Time: 1:15 pm – 2:45 pm

 

  • Designing a roadway through a 30 metre valley with cut and fill, slope stabilization and retaining walls
  • Using terrain modelling to support winter drivability and safety while protecting space for six lanes
  • Realigning West Nose Creek as part of one of Calgary’s largest urban creek diversions
  • Achieving $3.6 million in savings through value engineering of a single span NU2.8 girder bridge
  • Improving connectivity, pathways and community access through multidisciplinary coordination

Featured Projects

QEII / 40 Avenue Interchange

Airdrie, AB

144 Ave NW Corridor Improvements

Calgary, AB

Highway 1A / Highway 22 Interim Interchange

Cochrane, AB

17 Ave SE Stampede Crossing

Calgary, AB

Stay Up-To-Date on Project News and Career Opportunities