Project Description In 2019, ISL – with partner WSP and GEC – was retained by CMLC to undertake construction feasibility, cost-benefit review, detailed design, and construction of the new 17 Avenue SE Stampede Crossing (17SX). This station reconstruction includes...
Project Description As a part of The City of Calgary Main Streets Initiative, the 37 Street SW Streetscape attempts to create a truly inventive streetscape to adhere to future land use designation and development. Emphasis on design is aimed at creating a safe,...
Project Profile Beaver Boardwalk, with its 3.0km length, is the world’s longest freshwater boardwalk. It showcases the local wetland system around Maxwell Lake, Hinton. The boardwalk meanders through marshland and fens, bringing visitors close to the active...
Project Profile The City of Port Moody reconstructed Gatensbury Street as part of its 2018 Capital Program and retained ISL to perform the engineering work on this street improvements project. The project scope included detailed and final designs and drawings,...