


17 Avenue SE Stampede Crossing LRT
Project Description In 2019, ISL – with partner WSP and GEC – was retained by CMLC to undertake construction feasibility, cost-benefit review, detailed design, and construction of the new 17 Avenue SE Stampede Crossing (17SX). This station reconstruction includes...
37 Street SW Streetscape
Project Description As a part of The City of Calgary Main Streets Initiative, the 37 Street SW Streetscape attempts to create a truly inventive streetscape to adhere to future land use designation and development. Emphasis on design is aimed at creating a safe,...
Crowchild Trail Short Term Improvements
CROWCHILD TRAIL SHORT TERM IMPROVEMENTS ISL was retained to manage the tender preparation and construction delivery for the entire improvement plan, including work undertaken by other consultants. Client: City of Calgary Location: Calgary, AB Project...
Variable Speed Limit Scoping Study on QEII
VARIABLE SPEED LIMIT SCOPING STUDY ON QEII Alberta Transportation (AT) initiated this VSL scoping study to outline specific requirements for implementation on the QEII corridor between Calgary and Edmonton. Client: Alberta Transportation Location: Alberta Project...
Nanaimo Emergency Services Evacuation Route Planning
NANAIMO EMERGENCY SERVICES EVACUATION ROUTE PLANNING The intent is to enhance Nanaimo’s resiliency in responding to emergencies. Client: Regional District of Nanaimo Location: Nanaimo, BC Project Type: Transportation About This Project The Regional District of...
Highway 3:02 Functional Planning Study
HIGHWAY 3:02 FUNCTIONAL PLANNING STUDY Highway 3, from east of Sentinel to North of Pincher Creek, is currently being considered for twinning for a total length of approximately 54 km. Client: Alberta Transportation Location: Crowsnest Pass, AB Project...