First Avenue Improvements

First Avenue Improvements

Project Profile   The District of Mission retained ISL to revitalize First Avenue, the District’s principal downtown commercial street. Theproject area extends from Grand Street to Horne Street– a distance of over 500 m – and requires upgrades to municipal...
Gatensbury Road Improvements

Gatensbury Road Improvements

Project Profile   The City of Port Moody reconstructed Gatensbury Street as part of its 2018 Capital Program and retained ISL to perform the engineering work on this street improvements project. The project scope included detailed and final designs and drawings,...
Poplar Sanitary Lift Station and Forcemain

Poplar Sanitary Lift Station and Forcemain

Project Profile   The Village of Pemberton’s sanitary sewer catchment encompasses an area of 89 hectares comprised largely of residential land use. When it became clear that major portions of the existing sanitary sewer collection system were not only inadequate...
Sanitary Trunk Main at Nita Lake Lodge

Sanitary Trunk Main at Nita Lake Lodge

Project Profile   A significant portion of the existing sanitary trunk main for the Resort Municipality of Whistler aligns parallel and immediately adjacent to the existing CN Rail tracks. Through evaluation of CCTV works, a joint separation of 150mm was...
Sheep Paddocks Trail

Sheep Paddocks Trail

Project Profile Sheep Paddocks Trail, located within Colony Farm Regional Park in Coquitlam, BC, provides a multi-use hiking and cycling link between the regional Traboulay PoCo Trail and the Mundy Creek Trail. ISL was engaged to provide design, tendering and...
Eroded Riverbank Stabilization – Calgary

Eroded Riverbank Stabilization – Calgary

ISL was engaged by The City of Calgary to conduct the design and construction of stabilization and rehabilitation measures for multiple sites that were severely eroded by the June 2013 flood event. ISL managed five riverbank stabilization programs at the following...
Marine Drive Beach Lift Stations

Marine Drive Beach Lift Stations

Project Description   ISL was retained by the District of West Vancouver (WV) to review options to reconfigure and replace sanitary gravity mains, force mains, and lift stations within the Marine at the Beach collection system in 2015. In total, there were seven...
Blakeburn Lagoons Park

Blakeburn Lagoons Park

Project Description   In Blakeburn Lagoons Park, constructed wetlands were created to treat on-site contamination through phytoremediation as well as enhance biodiversity. The project included directing the municipal stormwater to the wetland to maintain...