First Avenue Improvements

First Avenue Improvements

FIRST AVENUE IMPROVEMENTS New streetscape elements include: wider sidewalks with decorative detailing, street corner curb bulges, crosswalk surfacing treatments, road curb alignments, and new and relocated catch basins. Client: District of Mission Location: Mission,...
Gatensbury Road Improvements

Gatensbury Road Improvements

GATENSBURY ROAD IMPROVEMENTS Gatensbury Road in Port Moody is now safer for all road users, and more accessible and more comfortable to use for pedestrians and cyclists. Client: City of Port Moody Location: Port Moody, BC Project Type: Transportation About This...
Whistler Superfly Ziplines

Whistler Superfly Ziplines

WHISTLER SUPERFLY ZIPLINES In the competitive zipline market in Whistler, this project involved creating two of the longest ziplines in Canada while building for safety and mitigating environmental impact. Client: The Adventure Group Whistler Location: Whistler,...
Fernie Memorial Arena Truss Repair

Fernie Memorial Arena Truss Repair

FERNIE MEMORIAL ARENA TRUSS REPAIR ISL developed an upgrade scheme which focused on using more wood, less steel, timber screws and more refined connection details. Client:  City of Fernie Location: Fernie, British Columbia Project Type: Buildings About This...
23 Avenue / Gateway Boulevard Interchange

23 Avenue / Gateway Boulevard Interchange

23 AVENUE / GATEWAY BOULEVARD INTERCHANGE The project saw Edmonton’s most collision prone intersection transformed into an interchange that improves intersection safety, enhances free-flow traffic and can accommodate the city’s future population. Client: City of...
G37 Interchange

G37 Interchange

G37 INTERCHANGE ISL and CH2M Hill partnered as lead consultants to the City of Calgary for functional planning, design and construction of a grade separated interchange at Glenmore Trail and 37 Street SW. Client: City of Calgary Location: Calgary, Alberta Project...
Stoney Nakoda Disaster Recovery

Stoney Nakoda Disaster Recovery

STONEY NAKODA DISASTER RECOVERY The devastating floods in Alberta in June 2013 left widespread damage and displaced many residents across the province.  Client: Alberta Social Housing Corporation Location: Stoney Nakoda, Alberta Project Type: Buildings...
Driftpile Water Treatment Plant

Driftpile Water Treatment Plant

DRIFTPILE WATER TREATMENT PLANT Innovative can sometimes be complex solutions, but the solution had to be such that the overall operation and maintenance of the facility was simplified and trouble-free. Client: Driftpile First Nation #450...