Eroded Riverbank Stabilization – Calgary

Eroded Riverbank Stabilization – Calgary

ISL was engaged by The City of Calgary to conduct the design and construction of stabilization and rehabilitation measures for multiple sites that were severely eroded by the June 2013 flood event. ISL managed five riverbank stabilization programs at the following...
Marine Drive Beach Lift Stations

Marine Drive Beach Lift Stations

Project Description   ISL was retained by the District of West Vancouver (WV) to review options to reconfigure and replace sanitary gravity mains, force mains, and lift stations within the Marine at the Beach collection system in 2015. In total, there were seven...
Blakeburn Lagoons Park

Blakeburn Lagoons Park

Project Description   In Blakeburn Lagoons Park, constructed wetlands were created to treat on-site contamination through phytoremediation as well as enhance biodiversity. The project included directing the municipal stormwater to the wetland to maintain...
Pinetree Way Revitalization

Pinetree Way Revitalization

Project Description   The 1.2 km stretch of Pinetree Way between Barnet Highway and Town Centre Boulevard is the primary gateway to Coquitlam’s City Centre. Once a car-centric, six-lane arterial roadway and truck route with few pedestrian amenities, the...