23 AVENUE / GATEWAY BOULEVARD INTERCHANGE
Location: Edmonton, AB
Project Type: Transportation
About This Project
Opened to traffic in September 2011, the new split diamond interchange resolves longstanding safety and congestion concerns, improves access and traffic flow, and will accommodate future growth in the south of the city. Team ISL successfully addressed issues ranging from the economic boom hitting as the project went to tender to site issues such as a major pipeline corridor crossing the interchange site and working within an area tightly bounded by residential areas to the west and commercial areas and rail tracks to the east.
After concept plan review and stakeholder dialogue, the original design was substantially modified to include a separate exit southbound from Calgary Trail; providing direct access to 19 Avenue/ South Edmonton Common retail area and mitigating concerns over loss of business.
Behind the Project
Integrated Expertise
- Transportation Engineering
- Structural Engineering
- Supporting Services