North Calgary Regional Transportation Study

North Calgary Regional Transportation Study

Project Profile   Between 1986 and 2016, the Calgary region experienced tremendous growth and became one of the leading economic regions of Canada. In this 30-year period, Calgary more than doubled its population, and other area municipalities, including Airdrie,...
St. Albert Network Speed Limit Review

St. Albert Network Speed Limit Review

Project Profile   The City of St. Albert is host to over 300 km of roadways, which a majority of its approximately 66,000 population rely on every day. The City’s road network is believed to have been designed with speed limits following the Transportation...
Deltaport Truck Staging Facility

Deltaport Truck Staging Facility

Project Profile   As part of the Deltaport Terminal Road and Rail Improvement Program (DTRRIP), Vancouver Fraser Port Authority (VFPA) proposed a truck staging facility as part of a series of ancillary road initiatives aimed at mitigating the impacts of the...
Elkford Flood Protection

Elkford Flood Protection

Project Profile   The District of Elkford required detailed floodplain mapping to investigate the combined hazards from flooding and geomorphic hazards. In 2018, ISL was retained to undertake a floodplain assessment, flood mapping and flood mitigation options for...
Beaver Boardwalk

Beaver Boardwalk

Project Profile   Beaver Boardwalk, with its 3.0km length, is the world’s longest freshwater boardwalk. It showcases the local wetland system around Maxwell Lake, Hinton. The boardwalk meanders through marshland and fens, bringing visitors close to the active...
First Avenue Improvements

First Avenue Improvements

Project Profile   The District of Mission retained ISL to revitalize First Avenue, the District’s principal downtown commercial street. Theproject area extends from Grand Street to Horne Street– a distance of over 500 m – and requires upgrades to municipal...
Gatensbury Road Improvements

Gatensbury Road Improvements

Project Profile   The City of Port Moody reconstructed Gatensbury Street as part of its 2018 Capital Program and retained ISL to perform the engineering work on this street improvements project. The project scope included detailed and final designs and drawings,...
Poplar Sanitary Lift Station and Forcemain

Poplar Sanitary Lift Station and Forcemain

Project Profile   The Village of Pemberton’s sanitary sewer catchment encompasses an area of 89 hectares comprised largely of residential land use. When it became clear that major portions of the existing sanitary sewer collection system were not only inadequate...