Waiparous Creek Bridge

Waiparous Creek Bridge

Project Profile   The Southern Alberta Fisheries Habitat Enhancement and Sustainability (FISHES) Program was developed to mitigate the risks to aquatic environments caused by extensive fording and off-roading following the 2013 floods. FISHES proposed the...
Highway 66 Elbow River Bridge

Highway 66 Elbow River Bridge

Project Profile   The Alberta Flood of 2013 impacted many areas of Southern Alberta, the bridge over the Elbow River bore a major onslaught of the flood waters. The force of the flood gouged not only a new path for the river, increasing its width from 180m2 to...
Green Necklace Greenway

Green Necklace Greenway

Project Profile   Grand Boulevard and East Keith Road ISL was retained to complete the detailed design, tender administration and construction review services for a 2.2 km section of the City of North Vancouver’s Green Necklace Greenway. The Green Necklace is a 7...
Sheep Paddocks Trail

Sheep Paddocks Trail

Project Profile Sheep Paddocks Trail, located within Colony Farm Regional Park in Coquitlam, BC, provides a multi-use hiking and cycling link between the regional Traboulay PoCo Trail and the Mundy Creek Trail. ISL was engaged to provide design, tendering and...
Green Spine Conceptual Design

Green Spine Conceptual Design

Project Profile   The Green Spine is envisaged as a continuous linear public park running through a developing high density, residential neighbourhood in North Vancouver. The Green Spine will be the primary internal public open space for the 15 hectare Lower Lynn...
Mill Creek Pedestrian Bridges

Mill Creek Pedestrian Bridges

Project Description   Mill Creek Ravine is an important urban park and key component of the City of Edmonton’s ecological and transportation network. The trail system in Mill Creek Ravine makes it a popular recreational destination, and a useful commuter link...
Eroded Riverbank Stabilization – Calgary

Eroded Riverbank Stabilization – Calgary

ISL was engaged by The City of Calgary to conduct the design and construction of stabilization and rehabilitation measures for multiple sites that were severely eroded by the June 2013 flood event. ISL managed five riverbank stabilization programs at the following...
Pinetree Way Revitalization

Pinetree Way Revitalization

Project Description   The 1.2 km stretch of Pinetree Way between Barnet Highway and Town Centre Boulevard is the primary gateway to Coquitlam’s City Centre. Once a car-centric, six-lane arterial roadway and truck route with few pedestrian amenities, the...