ISL at SMSB 2026 in Vancouver
Join us at the 12th International Conference on Short and Medium Span Bridges – the premier bridge engineering event in Canada – to explore the full scope of ISL’s Bridges team. From pedestrian bridges, highways and culverts to bridge rehabilitation, retaining walls, surveys, new technology and more. SMSB 2026 will explore the theme “Shaping the Future of Bridge Engineering: Low Carbon, Resilience, and Automation”, and ISL will be attending SMSB as a Diamond sponsor.
SMSB is held only once every four years, so be sure to stop by our exhibitor booth and say hello!
ISL at SMSB 2026 in Vancouver
Join us at the 12th International Conference on Short and Medium Span Bridges – the premier bridge engineering event in Canada – to explore the full scope of ISL’s Bridges team. From pedestrian bridges, highways and culverts to bridge rehabilitation, retaining walls, surveys, new technology and more. SMSB 2026 will explore the theme “Shaping the Future of Bridge Engineering: Low Carbon, Resilience, and Automation”, and ISL will be attending SMSB as a Diamond sponsor.
SMSB is held only once every four years, so be sure to stop by our exhibitor booth and say hello!
Program Schedule

Scott Loptson
P.Eng., F.E.C.
General Manager, Bridges/Structural – BC/Yukon

Sadegh Kazemi
Ph.D., P.Eng.
Manager – Bridge/Structural

Joseph Adom
P.Eng.
Senior Bridge Asset Engineer, BC MoTT
Tuesday 8/4/2026
SC6: Practical Asset Management for Bridge Engineers: Strategies, Tools, and Implementation
Time: 1:30 pm – 5:00 pm
-
Bridge Asset Management in BC Practice
-
Condition Assessment, Inspection Planning, and Performance Measures
-
Renewal Strategy Selection and Life-Cycle Perspectives
-
Tools, Technology, and Case Studies

Bhaskar Swaroop
M.Eng., P.Eng.
Structural Engineer

James Chapman
M.Sc., P.Eng.
Partner | Structural Manager
Hwy 1A / Hwy 22 Interchange in Cochrane, Alberta: Design and Construction of a Flared Steel Girder Bridge
Friday 8/7/2026
Time: 10:20 am – 12:00 pm
-
This case study focuses on the design and construction of the Highway 1A / Highway 22 interchange in Cochrane, Alberta – a two-span, 98 m long, fully integral welded steel plate girder bridge carrying Highway 22 over Highway 1A and the adjacent CPKC railway.
- Explore how close collaboration between designer, fabricator, and contractor resolved complex geometric and logistical challenges on a constrained site.
Featured Projects
HWY 1A / HWY 22 Interchange
Cochrane, AB
Macleod Trail & 162 Avenue Interchange
Calgary, AB







